Loft conversion Cheadle Hulme – update

The photographs show the next stage of the construction project with timber studs being put into place.  You can start to see from the timber framework the structure of the building inside and room lay out which is more clearly defined.  To support the structure and walls a steel ridge beam was installed.   Floor joists were also installed along with insulation and the existing purlins are now supported with the new steel beams.

As this is all now in place the first fix electrics and plumbing can begin.

«  |  »